Domestic Job Completion Record
4. Materials
4.1 Materials supplied by us
4.2 Materials supplied by client
6. Customer & feedback
6.3 Satisfaction rating (1–10)
6.4 Delivered as requested?
7. Engineer
7.3 Warranty period *
7.4 Job status *
7.5 Pro needed?
7.6 If incomplete / follow-up required – reason
8. Advisory
Optional notes to avoid misunderstandings after the job is completed.
9. Acceptances (required)