| Estimated Quote Number | HMS166 |
| Estimated Quote Date | 13/06/2023 |
| Valid Until | 13/07/2023 |
| Total | £852.00 |
| Hrs/Qty | Service | Rate/Price | Sub Total |
|---|---|---|---|
| 1 | New floor bathroom floor includes: same flooring material, installation adhesive, disposal of current floor, preference of floor before installation, sealant to seal the edges. |
£300.00 | £300.00 |
| 1 | tap shower includes: material shower , installation kit, disposal of current taps, preference of floor before installation, sealant to seal the edges. |
£250.00 | £250.00 |
| 1 | changing tub panel side includes: material bath tub panel, installation , disposal of current bath tub panel, preference of floor before installation, sealant to seal the edges. |
£160.00 | £160.00 |
| Sub Total | £710.00 |
| Tax | £142.00 |
| Total | £852.00 |